+233 (0) 50 555 1137
info@capitolengineergh.com

AKSA ENERGY GHANA

The Blue Ocean Investment Ltd fuel tank farms were constructed by Capitol Engineering between 2016 and 2017. The project comprised of six tanks of thirty-thousand-meter cubes with associated piping works and foundations. The cost of the project was $3.4m USD.